General Steel Structure Projects

Michelin - LMC 200 tons (Supply & Install)

Michelin - LMC 200 tons (Supply & Install)

Meiko Asia 106 tons (Supply & Install)

Meiko Asia 106 tons (Supply & Install)

Meiko Asia 106 tons (Supply & Install)

UKI Food Factory 350 tons (Design, Supply & Install)

Thai Oil Small Power Plant 550ton (Supply)

Thai Oil Small Power Plant 550ton (Supply)

Thai Oil Small Power Plant 550ton (Supply)

SICA MATERIAL PLANT 3,700 ton (Supply & Install)

SICA MATERIAL PLANT 3,700 ton (Supply & Install)

SICA MATERIAL PLANT 3,700 ton (Supply & Install)

SICA MATERIAL PLANT 3,700 ton (Supply & Install)

SICA MATERIAL PLANT 3,700 ton (Supply & Install)

Y-OAT Factory 680 tons (Supply & Install)

Promenada Shopping Center, Chiang Mai 2,548 tons (Supply & Install)

Promenada Shopping Center, Chiang Mai 2,548 tons (Supply & Install)

Promenada Shopping Center, Chiang Mai 2,548 tons (Supply & Install)

Karaweik Soft Drink Plant, Myanmar 320 tons (Supply)

Karaweik Soft Drink Plant, Myanmar 320 tons (Supply)

Betagen (Supply & Install)

Timfood (Supply & Install)

Timfood (Supply & Install)

PTT-Asahi Chemical AN-MMA Project, Rayong Thailand (Petrochemical Plant) 5,200tons (Supply & Install)

PTT-Asahi Chemical AN-MMA Project, Rayong Thailand (Petrochemical Plant) 5,200tons (Supply & Install)

PTT-Asahi Chemical AN-MMA Project, Rayong Thailand (Petrochemical Plant) 5,200tons (Supply & Install)

PTT-Asahi Chemical AN-MMA Project, Rayong Thailand (Petrochemical Plant) 5,200tons (Supply & Install)

PTT-Asahi Chemical AN-MMA Project, Rayong Thailand (Petrochemical Plant) 5,200tons (Supply & Install)

PTT-Asahi Chemical AN-MMA Project, Rayong Thailand (Petrochemical Plant) 5,200tons (Supply & Install)

PTT-Asahi Chemical AN-MMA Project, Rayong Thailand (Petrochemical Plant) 5,200tons (Supply & Install)

Amata RX-3 for Essilor 320tons (Supply & Install)

Electrolux Wet Plant 155tons (Supply & Install)

Nam Theun 2 Hydropower Plant, Laos 2,300 tons (Installation)

Nam Theun 2 Hydropower Plant, Laos 2,300 tons (Installation)

Lam Ta Khong Dam (Supply and Install Penstock)

Lam Ta Khong Dam (Supply and Install Penstock)

Bhumipol Dam (Supply and Install Penstock)

Siam Ferro (Supply & Install)

RAMA IV Fly Over Bridge (Install Steel Bridge)

RAMA IV Fly Over Bridge (Install Steel Bridge)

© 2023 by Sphere Construction. Proudly created with Wix.com

  • Line@
  • Facebook Social Icon
RTE-LOGO+with+name+(color)_edited.png

บจก. ริคไทย เอ็นจิเนียริ่ง (สำนักงานใหญ่) เลขที่ 168 หมู่ 9 ต.เปร็ง อ.บางบ่อ จ.สมุทรปราการ 10560

Tel: +66 97-2311540      Email: Rigthai@gmail.com

รับก่อสร้างโกดัง ก่อสร้างโรงงาน ก่อสร้างโกดังสำเร็จรูป ก่อสร้างโกดัง โครงสร้างเหล็ก สร้างโกดัง สร้างโรงาน โกดัง

<!-- Google Tag Manager (noscript) -->

<noscript><iframe src="https://www.googletagmanager.com/ns.html?id=GTM-TWGDPCW"

height="0" width="0" style="display:none;visibility:hidden"></iframe></noscript>

<!-- End Google Tag Manager (noscript) -->

<!-- Google Tag Manager -->

<script>(function(w,d,s,l,i){w[l]=w[l]||[];w[l].push({'gtm.start':

new Date().getTime(),event:'gtm.js'});var f=d.getElementsByTagName(s)[0],

j=d.createElement(s),dl=l!='dataLayer'?'&l='+l:'';j.async=true;j.src=

'https://www.googletagmanager.com/gtm.js?id='+i+dl;f.parentNode.insertBefore(j,f);

})(window,document,'script','dataLayer','GTM-TWGDPCW');</script>

<!-- End Google Tag Manager -->

bottom of page